Quick answer
To set up Cost factors, confirm the input format/device, choose output settings, then run a small batch. Height/location/difficulty/crane/stump/permits drive total.
Why it matters
Validate on a small sample before running the whole batch.
Height.
Step by step
- Check height/location/power lines/house/risk.
- Separate trimming/removal/stump/crane/cleanup.
- Use insured/qualified/portfolio contractors.
- Contract states scope/permits/cleanup/insurance.
Common mistakes
- Price only, not insurance/credentials.
- Not checking power lines/house risk.
- Ignoring stump/cleanup/permits.
- DIY on high-risk trees.
Checklist
- Height/location/lines/house/risk.
- Trim/removal/stump/crane/cleanup.
- Insurance/credentials/permits/portfolio.
- Contract/payment/cleanup/warranty.
- Budget/emergency/replant.
Key facts
- Height.
- Crane.
- Stump.
FAQ
How do I set up Cost factors?
To set up Cost factors, confirm the input format/device, choose output settings, then run a small batch. Height/location/difficulty/crane/stump/permits drive total.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: ISA